Dredging Update

Dredging is progressing along the southwest channel of the south end of the lake.

The equipment hit the water right after the pools opened for the season and already over 400 loads of sediment have been removed from the lake. Our plan is to start attacking the southeast channel when work is completed on the southwest channel. Aside from a few mechanical breakdowns with the push-boat and general maintenance to the scows, everything has been going smoothly.

The channel is now open from R.L. 21 to Lot 1116.