2021 RRA Chip and Seal Project

8/30/21 Update: The start date has moved to September 1st.

Day 1 – Dorset Dr, Eden Rock Court, Concord Court, Viscaya Circle, Lake Crest Dr, Sugar Creek Dr, Pierpont, & Ketchum.

Day 2 – Marina Dr (please park boat trailers on Conneaut Terrace), Rock Creek Terrace, Willowbrook, Rock Lane, Peacock Lane, Rome Terrace, Damvue, Cardinal Dr, Tupelo, Owl Point, Eagle Point, & Peninsula. This will more than likely go into a 3rd day due to all the cul-de-sacs in this batch.

The RomeRock Association will be chip and sealing a selection of its roads beginning in August. Please watch the eblast and our website as we will be posting a schedule before work beings. We request that all cars, trailers, and obstructions be removed from the roadway. The Chip and Seal work will be performed by Ronyak Paving.

The following streets will be chip and sealed this year:
East Side

  • Dorset Drive
  • Pierpont Drive
  • Lake Crest Drive
  • Sugar Creek Drive
  • Eden Rock Court
  • Concord Court
  • Viscaya Circle
  • Ketchum Road (East to Township)

West Side

  • Marina Drive
  • Rock Creek Terrace
  • Rock Lane
  • Peacock Lane
  • Owl Point
  • Eagle Point
  • Cardinal Drive to 615 Oriole
  • Rome Terrace (North of Orwell Lane)

North Side

  • Willowbrook Place
  • Damvue Drive
  • Tupelo Drive
  • Peninsula Place