{"id":4335,"date":"2015-09-17T10:07:26","date_gmt":"2015-09-17T14:07:26","guid":{"rendered":"http:\/\/www.roamingshores.org\/RRA1\/?p=4335"},"modified":"2015-09-17T10:55:42","modified_gmt":"2015-09-17T14:55:42","slug":"dredging-materials","status":"publish","type":"post","link":"https:\/\/www.roamingshores.org\/RRA1\/2015\/09\/17\/dredging-materials\/","title":{"rendered":"Dredging Materials"},"content":{"rendered":"<p>A lot of information about the dredging project has covered the work that occurs on the lake. But what happens to the sediment after it is removed from Lake Roaming Rock?<\/p>\n<p>After material is removed from the lake, it is transported to our site off of Crosby-Cook Rd to dewater (dry).<\/p>\n<figure id=\"attachment_4380\" aria-describedby=\"caption-attachment-4380\" style=\"width: 500px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.roamingshores.org\/RRA1\/wp-content\/uploads\/silt-from-fishermans-cove.gif\" data-rel=\"lightbox-image-0\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.roamingshores.org\/RRA1\/wp-content\/uploads\/silt-from-fishermans-cove-500x375.gif\" alt=\"Recently dredged material from Fisherman&#039;s Cove being dumped. Background: Dried material being moved.\" width=\"500\" height=\"375\" class=\"size-medium wp-image-4380\" \/><\/a><figcaption id=\"caption-attachment-4380\" class=\"wp-caption-text\">Recently dredged material from Fisherman&#8217;s Cove being dumped. Background: Dried material being moved.<\/figcaption><\/figure>\n<p>Above is the material that has been removed from the lake so far this year. It is currently in the process of dewatering (drying). Once the material has dried, it will be added to the pile of dried material. <\/p>\n<figure id=\"attachment_4383\" aria-describedby=\"caption-attachment-4383\" style=\"width: 500px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.roamingshores.org\/RRA1\/wp-content\/uploads\/DSCN2866.gif\" data-rel=\"lightbox-image-1\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.roamingshores.org\/RRA1\/wp-content\/uploads\/DSCN2866-500x375.gif\" alt=\"Foreground: Material to dry Background: Reclaimed material being moved to dry pile.\" width=\"500\" height=\"375\" class=\"size-medium wp-image-4383\" \/><\/a><figcaption id=\"caption-attachment-4383\" class=\"wp-caption-text\">Foreground: Material to dry<br \/>Background: Reclaimed material being moved to dry pile.<\/figcaption><\/figure>\n<figure id=\"attachment_4336\" aria-describedby=\"caption-attachment-4336\" style=\"width: 500px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.roamingshores.org\/RRA1\/wp-content\/uploads\/plum-creek-sediment.jpg\" data-rel=\"lightbox-image-2\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.roamingshores.org\/RRA1\/wp-content\/uploads\/plum-creek-sediment-500x375.jpg\" alt=\"Material from Plum Creek\" width=\"500\" height=\"375\" class=\"size-medium wp-image-4336\" srcset=\"https:\/\/www.roamingshores.org\/RRA1\/wp-content\/uploads\/plum-creek-sediment-500x375.jpg 500w, https:\/\/www.roamingshores.org\/RRA1\/wp-content\/uploads\/plum-creek-sediment.jpg 800w\" sizes=\"auto, (max-width: 500px) 85vw, 500px\" \/><\/a><figcaption id=\"caption-attachment-4336\" class=\"wp-caption-text\">Material removed from Plum Creek lake year.<\/figcaption><\/figure>\n<p>The above material is of the reclaimed material from last year that is now ready for RRA projects.  <\/p>\n","protected":false},"excerpt":{"rendered":"<p>A lot of information about the dredging project has covered the work that occurs on the lake. But what happens to the sediment after it is removed from Lake Roaming Rock? After material is removed from the lake, it is transported to our site off of Crosby-Cook Rd to dewater (dry). Above is the material &hellip; <a href=\"https:\/\/www.roamingshores.org\/RRA1\/2015\/09\/17\/dredging-materials\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Dredging Materials&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[33,31,1],"tags":[],"class_list":["post-4335","post","type-post","status-publish","format-standard","hentry","category-dredging-operations","category-lake-management-articles","category-news"],"_links":{"self":[{"href":"https:\/\/www.roamingshores.org\/RRA1\/wp-json\/wp\/v2\/posts\/4335","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.roamingshores.org\/RRA1\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.roamingshores.org\/RRA1\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.roamingshores.org\/RRA1\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.roamingshores.org\/RRA1\/wp-json\/wp\/v2\/comments?post=4335"}],"version-history":[{"count":0,"href":"https:\/\/www.roamingshores.org\/RRA1\/wp-json\/wp\/v2\/posts\/4335\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.roamingshores.org\/RRA1\/wp-json\/wp\/v2\/media?parent=4335"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.roamingshores.org\/RRA1\/wp-json\/wp\/v2\/categories?post=4335"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.roamingshores.org\/RRA1\/wp-json\/wp\/v2\/tags?post=4335"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}